Tuesday, October 31, 2017

The paving of Route Nationale #3

Facing west, in the direction of Pignon.
In 2008 when I first came to Caiman I flew from Port au Prince on MAF, since the 65 mile drive took 8 hrs.  By the time I started teaching at the university in Caiman in 2014, Route Nationale #3 was paved from Port to Hinche, so the trip took only 4 hrs.  The road had also been graded all the way to Pignon, as the plan had to be to pave it that far, but the money disappeared as it tends to do in Haiti.  Over the years the road deteriorated to the point that the 8 mile trip to Pignon took ½ hr.  Now (2017) the road is graded again in preparation for paving, and only takes 10 minutes (and now a good restaurant is there!).  The road crew is already putting in three bridges between Hinche and Bohoc.  Here are pictures of the one just to the west of the Bohoc market, along with a before photo showing the pedestrian crossing.
Facing east, toward the market.





Nov. 2014